Alabama Pole Barn Cost (2026): Prices by City and Size
A 30×40×12 pole barn with a 4" slab and two roll-up doors costs about $39,617 built in Huntsville. Click any price for the full itemized breakdown, or open the free calculator to price your exact size.
Turnkey pole barn prices across Alabama
Includes materials, 4" concrete slab, site prep, doors and a local licensed crew. Coastal counties include a 150 mph wind-rated package.
| City / area | 24×24 | 30×40 | 40×60 | 50×80 |
|---|---|---|---|---|
| Huntsville, ALMadison County | $21,556 | $39,617 | $68,658 | $106,306 |
| Birmingham, ALJefferson & Shelby County | $21,848 | $40,165 | $69,630 | $107,835 |
| Mobile, ALMobile County | $21,809 | $40,081 | $69,497 | $107,620 |
| Baldwin County, ALFairhope / Daphne / Gulf Coast | $21,516 | $39,532 | $68,518 | $106,076 |
| Montgomery, ALMontgomery County | $21,122 | $38,797 | $67,198 | $104,015 |
| Tuscaloosa, ALTuscaloosa County | $21,702 | $39,892 | $69,146 | $107,070 |
| Auburn & Opelika, ALLee County | $21,122 | $38,797 | $67,198 | $104,015 |
| Decatur & Cullman, ALMorgan & Cullman County | $22,138 | $40,709 | $70,603 | $109,362 |
| Dothan, ALHouston County | $20,810 | $38,204 | $66,147 | $102,352 |
| Florence & The Shoals, ALLauderdale County | $21,415 | $39,344 | $68,175 | $105,539 |
| Gadsden, ALEtowah County | $20,254 | $37,162 | $64,282 | $99,421 |
| Anniston & Oxford, ALCalhoun County | $21,267 | $39,071 | $67,687 | $104,774 |
Estimate only. Actual prices vary. No guarantee or warranty. Use as a guide only. Read the full disclaimer
What's included in these prices
- Pressure-treated posts set in concrete, engineered trusses and 29-gauge metal roof and walls
- Grading, gravel base and a 4-inch reinforced concrete floor
- Roll-up overhead doors, a walk door, trim, fasteners and gutters where listed
- Labor from a local crew, plus typical builder overhead and profit
Ways to save
- Buy the materials kit yourself and hire a crew for labor only. Use our $19 shopping list to price it at your local supply house.
- Get 3 bids on the same spec so you can compare apples to apples.
- Pour the slab after the building is dried in, which can lower concrete costs in rainy months.